Sunday 22 April 2012

Final day of editing

In our second day of editing we did have a few problems. we had got more use to the software which made the rest of the editing that needed to be done a lot easier however put the music onto the product was a lot more difficult than we thought it would be, we kept having trouble sorting out the length of the music for each scene we did finish our product in the end and we were very impressed with the final product after many weeks of planning and filming and editing, it was finally finished we were all quite emotional (LIES!) . It would have been better if we added all the stuff we wanted to add but then our clip would be like 5 minutes. We decided that our production name would be something that rang true to us and so came up with the name ' LAZY BOY PRODUCTIONS'

No comments:

Post a Comment